Osha Crane Regulations Knowledge Base
rigging qualification of offloading steel need osha regulations and ny regs? the material that is being offloaded is a tower (it's steel) for the crane, its being offloaded from a delivery truck at ground level it's 4 x 8 and weights 15,000, a crane is being used. how many men should be used and is there a regulation with osha on the way it should be done, and what protective eqipment should be supplied for the men. i need specific details.
Powered by Yahoo! Answers